RJ-1015

Greer Residence

Sample actions

Open what-if planner

Record details

Loss type
Water · Cat 2
Location
Bellevue
Day
9
Drying progress
64%
Carrier
Nationwide
Status
Critical
Next action
Moisture not trending down

Job summary

Basement water loss with slow drying curve. Moisture readings flat for 3 consecutive days — plan review required.

What-If Planner

Model the drying timeline before you commit equipment or crew

Currently Day 9, 64% to dry standard. Adjust the sliders to see projected dry-out date, cost, and risk.

Additional drying equipment+0 units
+0+1+2+3+4
Access / weather delay+0 days
+0+1+2+3+4+5

Baseline (no changes): dry-out projected 2026/06/24 · 6 more drying days · $432 equipment cost remaining.

Projected dry-out date

JUN 24

Remaining drying days

6.0days

Equipment cost change

+$0

Secondary damage risk

MODERATE

Baseline plan — current equipment, no delays. Drying tracks to standard on schedule with no added cost.